- Cost
In Italy, the budget is approx. 36,000
- Production capacity
For an 8 hour shift approx. 600 Kg
- Production employees for
a work shift
For the aforementioned production capacity:
1 specialised operator
1 generic operator
- Equipment
Small mixer, small mould, pasta cutter, water boiler, work surface,
refrigerated display.
|